Supporting One of Perth’s Most Significant Education Projects: ECU City

Westgyp is proud to be involved in the delivery of ECU City, Edith Cowan University’s landmark new 11-level campus in the heart of Perth.

Spanning approximately 65,000 square metres, the new campus will bring together education, research, business, technology and the creative arts, including new facilities for the Western Australian Academy of Performing Arts.

With complex architectural requirements, stringent seismic, acoustic and fire-performance criteria, and construction taking place above the Perth Busport and active train tunnels, ECU City is a highly technical project requiring close coordination across every stage of delivery.

Projects of this scale rely on the right systems, strong technical support and dependable supply. Westgyp’s role has been to support the project with a broad range of wall, ceiling, plasterboard and insulation products, backed by local product knowledge and delivery capability.

 

Siniat Plasterboard Supply

A major part of Westgyp’s involvement in ECU City was the supply of approximately 300,000m² of Siniat plasterboard to site.

The project required a broad mix of plasterboard products to suit different performance requirements throughout the building, including:

  • Mastashield 10mm and 13mm
  • Multishield 13mm
  • Impactshield 13mm
  • Trurock and Trurock HD
  • Fireshield 13mm and 16mm
  • Curveshield
  • Intershield 25mm

Supplying this volume and range of board across a project of this scale required careful coordination, reliable stock availability and consistent delivery throughout construction.

It is a strong example of the role Westgyp plays on major commercial projects — not simply supplying individual products, but supporting contractors with the volume, range and reliability required to keep work moving.

 

Full portrait shot of Westgyp crane truck delivering commercial building supplies to the ECU City Campus construction in Perth.

 

Rondo Wall and Ceiling Systems

Westgyp also supported the project as a Rondo distribution partner, supplying systems used across a range of internal wall, external wall and ceiling applications. 

One of the standout elements is a raked, double-hung suspended ceiling constructed using the Rondo KEY-LOCK® Concealed Suspended Ceiling System. The project also includes a 24-metre-high engineered wall designed to support multiple linings and a suspended artwork weighing approximately 200kg. 

Rondo provided the engineering, technical detailing and project-specific design support behind these applications, working closely with Multiplex, Cubic, Finlay Group and Westgyp.

Systems used across the project include:

  • Rondo KEY-LOCK® Concealed Suspended Ceiling System
  • Rondo Steel Stud & Track Wall Framing System
  • Rondo MAXIframe® External Wall Framing System
  • Rondo Acoustic Assemblies
  • Rondo Panther® Access Panels
  • Rondo EXANGLE® Plastering Beads
  • Rondo EXANGLE® Render & Texture Beads

Together, these systems support the structural, acoustic, fire and architectural requirements across a wide range of spaces throughout the campus.

 

Enterprise 310 Ceiling System

Approximately 4,200m² of Enterprise Architectural’s Enterprise 310 ceiling system, incorporating a concealed J Bar grid, was specified across multiple levels of ECU City. The system delivers a clean, refined finish while supporting the broader architectural intent and performance requirements of the project.

Enterprise Architectural worked with Cubic and Finlay Group Construction on the design, engineering and delivery of the system.

Westgyp is now the sole WA distributor for Enterprise Architectural products, giving contractors and builders across Western Australia local access to the Enterprise 310 system and the broader Enterprise Architectural range.

 

Select Insulation

Select Insulation products were also used on the project by Finlay Group Construction, supporting the performance requirements of the internal building systems.

As a supplier of Select Insulation, Westgyp can support commercial contractors with insulation solutions suited to demanding acoustic, thermal and fire-performance requirements.

 

Reliable Supply for Complex Commercial Projects

On a major commercial project, reliable supply is about more than having product available.

Access, timing and delivery logistics can become significant issues, particularly on complex CBD sites with multiple trades operating at once.

At ECU City, Westgyp’s crane truck capability became a practical solution to an onsite delivery challenge, allowing materials to be lifted and positioned where they were needed when standard delivery access was limited.

Combined with the supply of approximately 300,000m² of Siniat plasterboard, Rondo systems, Select Insulation and other key building products, this demonstrates the broader role Westgyp plays on large-scale commercial projects.

It is about having the product knowledge, supplier relationships, stock capability and logistics support needed to keep construction moving.

 

Commercial Wall and Ceiling Systems in Perth

Westgyp supplies wall, ceiling, plasterboard and insulation systems for commercial projects across Perth and Western Australia.

From suspended ceilings and steel framing through to plasterboard, acoustic systems, access panels, insulation and specialist architectural ceiling products, we work with contractors on projects where product knowledge, availability and reliable supply matter.

Westgyp is also now the sole WA distributor for Enterprise Architectural products, including the Enterprise 310 system used at ECU City.

Whether it is a commercial fit-out or a major development, our team can help identify the right system, coordinate supply and support the project from specification through to delivery.

An aerial shot of ECU city campus at dusk.
Image Source: ECU City

More Case Studies