Project Overview
The Ranges Clubhouse project in Karratha, WA, involved the fit-out of a modern sporting clubhouse designed to deliver a clean, high-end environment for members and visitors. The project required ceiling solutions that not only complemented the contemporary design vision but also performed to the practical demands of a busy community sporting facility.
Stonewall Platinum’s Aspect MEDIGRID Ceiling Tiles were selected for the project, covering a total of 1,100m² across both white and black ceiling applications. The result was a sleek and functional ceiling system that balanced aesthetics, durability and ease of maintenance.
Project Specifications
- Builder: Thomas Building
- Brand: Stonewall Platinum
- Products Used: Stonewall Platinum Aspect MEDIGRID Ceiling Tiles
- Project Type: Sporting Clubhouse
- Location: Karratha, WA
- Project Size:
- 860m² White Ceiling Tiles
- 240m² Black Ceiling Tiles
Design & Material Selection
A key goal of the project was to create one of the most modern sporting facilities in Karratha using products that delivered both visual appeal and long-term practicality.
Stonewall Platinum’s Aspect MEDIGRID Ceiling Tiles were chosen for several reasons:
- Clean and modern finish that elevated the overall look of the clubhouse
- Strong performance characteristics suited to high-traffic commercial environments
- Easy-to-clean surface, supporting ongoing maintenance requirements
- Reliable product consistency across both black and white ceiling applications
The combination of functionality and presentation made MEDIGRID the ideal solution for the project.

Challenges & Execution
One of the primary challenges for the project was logistics, given the regional location of Karratha and the scale of the installation.
Westgyp managed the supply and coordination process to ensure materials arrived on time and installation could proceed without disruption. Careful planning and product availability helped keep the project running smoothly from start to finish.
Results
The completed clubhouse achieved the clean and modern aesthetic outlined in the original project vision while also meeting the practical performance requirements of the space.
Key outcomes included:
- A high-quality ceiling finish across all areas of the clubhouse
- Durable and easy-to-maintain ceiling systems
- Reduced long-term maintenance and wastage due to the ease of cleaning
- Efficient project delivery despite regional logistics requirements

Client & Contractor Feedback
The client was highly satisfied with the final outcome, particularly the modern appearance and practicality of the finished ceilings.
The ease of cleaning and maintenance was seen as a major long-term benefit, helping reduce wastage and ongoing operational costs for the facility.